Specification Review
State the required geometry, material, dimensions and supporting documents. Keep uncertain measurements clearly marked until the specification is confirmed.
Record the face dimensions of a sheet separately from the three outside dimensions of an assembled pack. Mark the installed top, support positions and any cut-outs. You can start with a sketch and photographs if the original drawing is unavailable.
Describe the existing condition, the part of the fill area being replaced and the intended scope. Include support details, pack orientation and the planned maintenance window. Installation methods and any adhesive or fastening requirements must follow the instructions for the actual product and site.
Bring the material grade together with temperature, water chemistry, thickness and support conditions. A general material name does not establish a finished fill rating. Select a known specification or describe the application so the requirement can be reviewed.
State the required geometry, material, dimensions and supporting documents. Keep uncertain measurements clearly marked until the specification is confirmed.
Identify whether the requirement is for individual sheets, assembled packs or a defined set. Include quantity, package requirements and destination.
Send the product reference, drawing or photographs available for the project. The proposed configuration and delivery scope belong in the quotation.