Cooling Tower Maintenance
The fill material can become fouled or damaged, reducing its effectiveness and potentially leading to problems with the cooling tower. In such cases, it may be necessary to replace the fill material to ensure the cooling tower continues to operate efficiently.
Measure the size of the filler
We need to tailor the filler size according to the size of the cooling tower, so that it can be used directly.
You should choose the right cooling tower fills according to the working temperature and conditions.
Bonding the cooling tower sheets into specified sizes of blocks on the construction site. When bonding, you should make sure that the pressure onto the packing sheet is even and leave the full curing time.